Skip to main navigation.

Rates

Rate Schedule

 

New rate will begin on January 1st, 2017, – 1st bill February 1st

Residential, Farm, Public Authorities & Seasonal

Service Minimum - $35.00 per month
First 800 kWh per month at .11 (800 kWh equals $88.00)
Remaining kWh per month at .08
All separately metered electric heat - Heat credit .02 (October - April)
A service using over 75 KW will be billed under the Large Power rate.  

Small Commercial
Service Minimum - $40.00
First 800 kWh per month at .11 (800 kWh equals $88.00)
Remaining kWh per month at .08
All separately metered electric heat - Heat credit .02 (October - April)
A service using over 75 KW will be billed under the Large Power rate.  

Street Lighting and Outdoor Lighting

175 watt mercury vapor $10.95 per month 
400 watt mercury vapor $16.45 per month 
Lucalox  $17.45 per month
150/175 Metal Halide $10.95 per month
400W Metal Halide $17.45 per month   
LED 70 W $10.95 per month
LED 100 W $16.45 per month

          

Metered Security Lights

100-175 watt mercury vapor/metal halide high pressure sodium $4.50 
400 watt mercury vapor/metal halide  $5.25 

    

Irrigation Controlled Rate
Horsepower charge $25.00 per horsepower per season
$3.50 per KW per month
All KWH at $0.054
 

Irrigation Non-Controlled Rate
Horsepower charge $25.00 per horsepower per season
$13.50 per KW per month
All KWH at $.065
 

Irrigation Pivot Only
Service Minimum $420.00 per season ($70 per month)
All kWh at .09

Small Power – 3 phase – 50 KW and under     
Service Minimum - $55.00 per month
(KW – 25) x $13.50
(First 100 kWh x KW) x .11
Remaining kWh per month at .08
Separately metered electric heat - Heat credit .02 per kWh(October - April)

Large Power – 3 Phase – 50.01 KW and over  
Service Minimum - $55.00
(KW – 10) x $13.50
(300 kWh x KW) x .065
Remaining kWh per month at .055
Separately metered electric heat - Heat Credit .02 per kWh (October - April)                       

                                                 
                                            FEES

Late Charge  

$12.50
1.5% interest of unpaid
balance into billing

Connection Fee     

$ 25.00  

Deposit  

$200.00

Transfer Fee

$15.00

Security Light Installation      

$75.00

Vandalized Security Light repair:  

175 Watt
400 Watt
Bulb only                                   

$50.00
$75.00
$25.00

Meter Loop installation on existing pole       

$150.00

Staking Fee on new service (non-refundable) 

$150.00

Perfecting Fee on new service   

$150.00

Aid to construction on single phase overhead line build

$3.50 per foot

Aid to construction on single phase underground line build  

$6.00 per foot

Aid to construction on three phase overhead line build 

$8.00 per foot

Aid to construction on three phase underground line build

$13.00 per foot

Powered by Touchstone Energy Cooperatives Logo