CALL US AT: 605-685-6581
Rates
Your Energy > Rates
Rate Schedule
Rates as of April 1st, 2026 - 1st bill May 1st
Facility Charge - $57.50 per month
All kWh per month - $.088
Demand Charge up to 25 KW @ $2.75 each
Demand Charge All Excess KW @ $15.75 each
All separately metered electric heat - Heat credit @ .02 (October - April)
A service using over 50 KW or greater, served by 75 KVA or greater Transformer, Commercial Ev Charging Stations will be billed under the Small or Large power rate.
| Lighting Type | Monthly Rate ($) |
| Lucalex HPS 100 W | $12.00 |
| Metal Halide 150 W | $12.00 |
| Pole Metal Halide 150 W | $13.00 |
| Lucalux HPS 150 W | $12.00 |
| Mercury Vapor 175 W | $12.00 |
| Pole Mercury Vapor 175 W | $13.00 |
| Metal Halide 175 W | $12.00 |
| 2 Poles Metal Halide 175 W | $14.00 |
| Mercury Vapor 400 W | $18.00 |
| Pole Mercury Vapor 400 W | $19.00 |
| 2 Poles MV 400 W | $20.00 |
| Metal Halide 400 W | $19.00 |
| Pole Metal Halide 400 W | $20.00 |
| Metal Halide Floodlight 400 W | $19.00 |
| Pole MH Floodlight 400 W | $20.00 |
| 2 Poles MH Floodlight 400 W | $21.00 |
| Lucalux HPS 400 W | $19.00 |
| Pole Lucalux HPS 400 W | $20.00 |
| LED 50 W | $12.00 |
| LED 60 W | $12.00 |
| LED 70 W | $12.00 |
| Pole LED 70 W | $13.00 |
| 2 Pole LED 70 W | $14.00 |
| LED Floodlight 76 W | $12.00 |
| LED 100 W | $18.00 |
| Pole LED 100 W | $19.00 |
| 2 Poles LED 100 W | $20.00 |
| LED 115 W | $18.00 |
| Pole LED 115 W | $19.00 |
| 175 W MV Converted to 35W LED | $12.00 |
| Pole 175 W MV Converted to 35W LED | $13.00 |
| 400 W MV Light Converted to 35W LED | $18.00 |
| Pole 400 W MV Converted to 35W LED | $19.00 |
| Metered Metal Halide 150 W | $5.50 |
| Pole Metered Metal Halide 150 W | $6.50 |
| Metered Mercury Vapor 175 W | $5.50 |
| Pole Metered Mercury Vapor 175 W | $6.50 |
| Metered Metal Halide 175 W | $5.50 |
| Metered Mercury Vapor 400 W | $6.50 |
| Pole Metered Mercury Vapor 400 W | $7.50 |
| Metered Metal Halide 400 W | $6.50 |
| Pole Metered Metal Halide 400 W | $7.50 |
| Metered Metal Halide Floodlight 400 W | $6.50 |
| Metered Lucalux HPS 400 W | $6.50 |
| Metered LED 50 W | $5.50 |
| Pole Metered LED 50 W | $6.50 |
| Metered LED 70 W | $5.50 |
| Pole Metered LED 70 W | $6.50 |
| Metered LED 100 W | $5.50 |
| Pole Metered LED 100 W | $6.50 |
| City Fire Sirens | $12.00 |
A fixed horsepower charge of $25 per horsepower per year, plus energy charges of:
May 1st – Oct. 31st
Demand charge: KW x $5.75 per month
All kWh @ .0565 cents
Nov. 1st – April 31st
Demand charge: KW x $15.75 per month
All kWh @ .0675 cents
FEE:
A fee (per Fee Schedule A) will be applied each time a service is changed from Controlled to Non-Controlled between May and October.
As our billing cycle begins on the 1st of each month, any rate change made prior to the 1st will be billed at the applicable rate for that billing period.
A fixed horsepower charge of $25 per horsepower per year, plus energy charges of:
Demand charge: KW x $15.75 per month
All kWh @ .0675 cents
50.00 to 99.99 KW at any time within a 12-month period, EV Commercial Charging Stations or service requiring 75 KVA to less than 150 KVA transformer
Facility Charge - $85.00 per month
Demand Charge All KW x $15.75
All kWh per month @ .0575
Separately metered electric heat - Heat credit .02 per kWh (October - April)
100.00 KW and over at any time within a 12-month period or a service requiring 150 KVA or greater transformer.
Facility Charge - $105.00
Demand Charge: All KW x $14.50
All kWh per month @ .060
All separately metered electric heat - Heat Credit .02 per kWh (October - April)
All KW will be billed @$5.75
On-Peak KW will be billed an additional $10.00 per KW
(making the Peak Time of use rate $14.50 per KW)
On-Peak Times: June - September (3 pm - 7 pm) - October - May (7 am - 9 am), (6 pm - 10 pm)
| After Hours Reconnect Fee | $ 75.00 |
| Collection Fee | $ 25.00 |
| Connect Fee | $ 25.00 |
| Deposit | $ 200.00 |
| Disconnect for Non-Payment Fee | $ 25.00 |
| Late Charge | $ 12.50 |
| Reconnect Fee | $ 50.00 |
| Transfer Fee | $ 15.00 |
| NSF Fee | $ 30.00 |
| Reward for Tampered Meter Info | $ 100.00 |
| Service Tampering Fee | $ 250.00 |
| Double Throw Fee | $ 250.00 |
| Heat Meter Installation | $ 100.00 |
| Installation of New Single Phase Service on Existing Pole | $ 250.00 |
| Installation of New Three Phase Service on Existing Pole | $ 1,050.00 |
| Meter Loop Fee | $ 200.00 |
| 049 Fee | $ 150.00 |
| Perfecting Fee | $ 200.00 |
| Staking Fee | $ 200.00 |
| Security Light Installation | $ 75.00 |
| Security Light w/ Pole Installation | $ 150.00 |
| Vandalized Security Bulb Fee | $ 50.00 |
| Vandalized Security Light Fee 175W | $ 75.00 |
| Vandalized Security Light Fee 400W | $ 100.00 |
| Vandalized LED Security Light | $ 150.00 |
| Interest on Balance in Billing | 1.5% |
| ERC Loan Interest | 5.0% |