Facility Charge - $52.50 per month All kWh per month @ .088 Demand Charge up to 25 KW @ $1.50 each Demand Charge All excess KW @ $14.50 each All separately metered electric heat - Heat credit @ .02 (October - April) A service using over 50 KW or greater, served by 75 KVA or greater Transformer, Commercial Ev Charging Stations will be billed under the Small or Large power rate.
175 watt mercury vapor
$11.00 per month
400 watt mercury vapor
$17.00 per month
Lucalox
$18.00 per month
150/175 Metal Halide
$11.00 per month
400W Metal Halide
$18.00 per month
LED 70 W
$11.00 per month
LED 100 W
$17.00 per month
100-175 watt mercury vapor/metal halide high pressure sodium
$5.00
400 watt mercury vapor/metal halide
$6.00
Horsepower charge $25.00 per horsepower per season $4.50 per KW per month All kWh at $0.0565
Horsepower charge $25.00 per horsepower per season $14.50 per KW per month All KWH at $.0675
50.00 to 99.99 KW at any time within a 12-month period, EV Commercial Charging Stations or service requiring 75 KVA to less than 150 KVA transformer
Facility Charge - $80.00 per month Demand Charge All KW x $14.50 All kWh per month @ .0575 Separately metered electric heat - Heat credit .02 per kWh (October - April)
100.00 KW and over at any time wthin a 12-month period or a service requiring 150 KVA or greater transformer.
Facility Charge - $100.00 Demand Charge: All KW x $14.50 All kWh per month @ .060 All separately metered electric heat - Heat Credit .02 per kWh (October - April)
DEMAND CHARGE: All KW will be billed @$4.50 On-Peak KW will be billed an additional $10.00 per KW (making the Peak Time of use rate $14.50 per KW) On-Peak Times: June - September (3 pm - 7 pm) - October - May (7 am - 9 am), (6 pm - 10 pm)
Late Charge
$12.50 1.5% interest of unpaid balance into billing
Connection Fee
$25.00
Deposit
$200.00
Transfer Fee
$15.00
Security Light Installation
$75.00
Vandalized Security Light repair:
175 Watt 400 Watt Bulb only
$50.00 $75.00 $25.00
Meter Loop Fee
$150.00
Staking Fee on new service (non-refundable)
$150.00
Perfecting Fee on new service
$150.00
Aid to construction on single phase overhead line build
$5.00 per foot
Aid to construction on single phase underground line build
$5.00 per foot
Aid to construction on three phase overhead line build
$13.00 per foot
Aid to construction on three phase underground line build